Project Brief:

For a tough, durable, aesthetically appealing and skid resistant finish, the licensed contractor installed 150m2 of the cold-applied Pro-BW® (Reinforced)® system from Proteus Waterproofing. A fine aggregate in the skid resistant finish was added by Proteus to allow for an easy cleaning surface. Pro-BW® (Reinforced)®system also allowed complex detailing around perimeter upstands and outlets to be applied quickly and efficiently.

Key Requirement: Minimal disruption

Pro-BW® (Reinforced) ensured minimal disruption and inconvenience thanks to the fast curing system allowing foot traffic within TWO hours of installation. The use of Pro-BW® (Reinforced) also reduced the risk of further water ingress whilst works were undertaken, and ensured access to the terrace was reinstated quickly and efficiently.

Key Requirements: Health and Safety

As it is cold installed, Pro-BW® (Reinforced) meets health and safety criteria by minimising risk to site operatives and local residents. Pro-BW® (Reinforced) also offers a low-odour application to provide the safest and most convenient solution on site for the licensed contractor.

Key Requirement: Quality control

Proteus Waterproofing and the licensed contractor worked in close partnership to successfully deliver the project to a very high standard within the required timeframe.  The specialist contractor removed the existing build-up, levelled off the existing substrate and then made the area watertight with DPM Primer before the Pro-BW® (Reinforced) was applied.