Project Brief:

The existing roof substrate, comprising a felt cap sheet, felt underlay, 100mm PIR insulation and timber deck, was suitable to accept a new overlay system. Proteus Waterproofing was appointed to supply 552m2 of Proteus Pro-System® which was installed by the licensed contractor during the school holiday, offering the school the most cost-effective and least disruptive solution.

Key Requirements: Health and Safety

As Proteus Pro-System® is cold installed, it meets all health and safety criteria to occupied buildings and minimises risk of fire. The low odour application allowed the Proteus licensed contractor to work safely and with minimal disruption to building occupants.

Key Requirements: Seamless waterproofing

With the project requiring a seamless membrane, Proteus Waterproofing worked in close partnership with the licensed contractor to successfully deliver the waterproofing application to a very high standard.

Key Requirements: Long term performance

Proteus Pro-System® waterproofing system offers 10, 15, 20 and 25-year durability options which are also available with independently provided insurance backed guarantees. For the Hampton Wick Primary School refurbishment, Proteus Pro-System® was supplied with a 20-year life expectancy before its first major maintenance.