Project Brief:

Due to water leaking through the car park deck into the factory shop floor below causing disruption to the day-to-day running of the business, the client Castell Safety International required a long term waterproofing solution which offered a fast cure time, a low odour application and minimal disruption.

Having removed the existing brick block pavers bedded in sand, the licensed contractor discovered there was no waterproofing membrane present and the existing screed over a concrete deck was all that was keeping the water out.  The fast applied and market proven Proteus Cold-Melt® seamless waterproofing was installed to 400m2 of podium deck in five working days from start to finish and the brick block pavers were then replaced.

Key Requirements: Health and safety

Working on occupied buildings, particularly in cities, safety is always of utmost importance. Proteus liquid applied systems are cold installed and meet all health and safety criteria to work on occupied buildings and minimise risk of fire. With the factory operational, the low odour application allowed the Proteus Licensed Contractor to work safely and with minimal disruption to employees and members of the public.

Key Requirements: Seamless waterproofing                                   

Proteus Waterproofing worked in close partnership with the Licensed Contractor to successfully deliver the project to a very high standard.

Key Requirement: Long term performance

Cold-Melt® waterproofing system offers a range of roofing system solutions including inverted roofs, green roofs and podium decks.