Project Brief

With the failing section also used as a fire exit, Proteus supplied 800m2 of Pro-System to provide a seamless and high quality surface that would ensure safe passage for a high number of people. Proteus also supplied its Pro-Felt system in Black Mineral to repair the vertical movement joints.

Key Requirements: Health and Safety

When working on occupied or public buildings, safety is always of utmost importance. As Pro-System is cold installed, it meets all health and safety criteria to occupied buildings and minimises risk of fire.

Key Requirement: Long Term Performance

Pro-System waterproofing system offers 10, 15, 20 and 25 year durability options. Pro-System does not embrittle, wear away or yellow with age.

Key Requirement: Aesthetics

Available in a variety of colours, Pro-System was supplied in Mid Grey to meet the client’s requirements.