Project Brief:

For a tough, durable, aesthetically-appealing and skid resistant finish, the licensed contractor installed 150m2 of the cold-applied Pro-BW® (Reinforced) system from Proteus Waterproofing.  Pro-BW® (Reinforced) system also allowed complex detailing around balcony balustrades and staircases to be applied quickly and efficiently.

Key Requirement: Minimal disruption

Pro-BW® (Reinforced) ensured minimal disruption and inconvenience thanks to the fast curing system allowing foot traffic within TWO hours of installation. The use of Pro-BW® (Reinforced) also reduced the risk of further water ingress whilst works were undertaken, and ensured access to the balcony and staircase was reinstated quickly and efficiently.

Key Requirements: Health and Safety

As it is cold installed, Pro-BW® (Reinforced) meets health and safety criteria by minimising risk to site operatives and local residents. Pro-BW® (Reinforced) also offers a low-odour application to provide the safest and most convenient solution on site for the licensed contractor.

Key Requirement: Quality control

Proteus Waterproofing and the licensed contractor worked in close partnership to successfully deliver the project to a very high standard within the required timeframe. Proteus Technical Managers made regular inspections, reporting on progress, ensuring the installation of Pro-BW® (Reinforced) met the required standards.